On March 7, in the roar of machinery, the foundation pit of the 4-standard Yinshan 2nd Road Station of the Tongsuhu Intercity Railway (Nanxun to Changxing Section) undertaken by China Railway Fourth Bureau Group Co., Ltd. was successfully excavated, which laid a solid foundation for the construction of the main structure of the subsequent station for the first underground station of the whole line of the Rutongsu Lake Intercity Railway to enter the foundation pit excavation stage.
construction site
Introduction to the project
Yinshan 2nd Road Station is located at the intersection of Yingbin Avenue and Yinshan 2nd Road, Wuxing District, Huzhou City, close to Huzhou Financial CBD Center, is an underground two-storey island station, with a total length of 267m, a standard section width of 23m, a depth of 18m, and four supports (1 concrete support + 3 steel supports); The large and small mileage sides are shield launch shafts, with a width of 30.1m and a maximum depth of 21.4m, with five supports (1 concrete support + 4 steel supports); The enclosure structure adopts underground diaphragm wall, and the whole adopts the open-cut and cut method for construction.